Wastewater treatment equipment is not something that can be easily traded for treatment. Manufacturers must have a certain ability to produce, and then they also need to pass the acceptance test. Selling it out is not that easy. How to conduct the acceptance test?
The first point of acceptance for sewage treatment equipment is the original application report and the environmental monitoring center of the ecological and environmental protection authority, or the authorized lower level environmental monitoring center for acceptance. Can the regulations and specifications written in the acceptance specification book be met. The final evaluation is whether the product quality and raw materials used by sewage treatment enterprises are environmentally friendly, and the final evaluation is after-sales maintenance services.
Acceptance Specification for Industrial Production Wastewater Treatment Equipment: 1. The acceptance shall be carried out by the ecological environment protection supervisory agency at the same level as the original audit report or report, or by the lower level environmental monitoring center authorized by it. 2. Acceptance standards are the standards specified in reports or tables, and if there are other new regulations from the competent authorities of ecological and environmental protection administrative departments. 3. Every year, I visit clients on time and present them with water treatment and related technical knowledge. To prevent unnecessary inconvenience, a crucial part of daily sewage treatment equipment must undergo regular inspection and acceptance by the Environmental Protection Bureau before delivery for use. Manufacturers should assist customers in verifying the standards obtained from the national environmental protection department or ecological environment protection measures in the environmental hazard assessment report, and conduct acceptance at the same level environmental monitoring center of the national environmental protection department or the lower level environmental monitoring center.
Acceptance shall be carried out by the same level environmental monitoring center of the ecological environment protection regulatory agency that originally reviewed the report or report, or by the lower level environmental monitoring center authorized by it. Acceptance standards are the standards specified in reports or tables, and if there are other new regulations from the competent authorities of ecological and environmental protection administrative departments. Standardize the environmental protection measures specified in the environmental impact assessment report or table, or the specifications obtained from the environmental impact assessment approval. If the specific infrastructure construction is inconsistent with the environmental assessment, find the air pollutant environmental protection standards and groundwater product quality standards for the corresponding areas based on the local water effect classification.
The manufacturer must present the product certificate of conformity, instructions for use, and apply for acceptance to obtain these certificates. There are also equipment qualification certificates, product production licenses, and purchase tax invoices. Jifoshan Technology specializes in green environmental protection products and scientific research and development, power installation engineering design schemes, environmental protection equipment engineering, environmental protection equipment operation and technical consulting, and other business processes.
专业水处理的疑难问题,产品选型问题,可以单击下面的微信二维码电话联系贺工在线指导,长按微信二维码可自动识别添加贺工微信沟通解决您的疑难问题


简体中文
Vietnamese
Persian
繁体中文
Albanian
Irish
Arabic